Expert perspectives on advanced manufacturing construction from the FusionIRX team.

EV Battery Plant Construction Has a Different Risk Profile Than You Assume

Battery manufacturing shares vocabulary with semiconductor fabs — cleanrooms, tight tolerances — but the actual risk profile is different in ways that matter for how the project should be managed.

Read more →

Hiring for Commissioning Teams: Why Credentials Aren't Enough

Certifications tell you someone passed a test. They don't tell you whether they'll flag an uncomfortable finding to a client under schedule pressure — and that second trait is the one that actually matters.

Read more →

QA/QC Documentation Isn't Paperwork. It's the Only Proof You Have.

When a system fails months after handover, the documentation from QA/QC testing is what determines whether it was installed correctly and failed anyway, or was never actually verified in the first place.

Read more →

Data Center Redundancy Tiers Are a Starting Point, Not a Finish Line

Naming a tier level in the design brief tells you the redundancy target. It doesn't tell you whether the facility actually achieves it under a real failure scenario — that's what commissioning is for.

Read more →

What Semiconductor Site Selection Actually Weighs in 2026

Site selection conversations tend to focus on incentives and land cost. The factors that actually determine whether a fab hits its production timeline are usually further down the list.

Read more →

The BIM Model Is Not the Building. Coordination Meetings Are.

A perfectly clash-free BIM model doesn't build anything on its own. The coordination meetings where trades actually agree on resolutions are where the model becomes useful — and where most teams under-invest.

Read more →

Why Cleanroom Airflow Balancing Takes Longer Than You Think

Airflow balancing in a semiconductor cleanroom isn't a mechanical checklist item. It's an iterative process that fights the building itself, and schedules that treat it as a quick task are the ones that slip.

Read more →

The Owner's Project Requirements Document Nobody Reads Until It's Too Late

The OPR is supposed to be the single source of truth for what a facility has to do. On most projects it gets written once, filed, and never checked against again until commissioning finds the gap.

Read more →